ECO GOLD
24
Before putting the device into operation
25/08/2011/ YACE0088
Assembly as cooling thermostat
Notice
Falling / toppling equipment
Property damage
•
Do not tilt the cooling device during transport and
never turn it upside down.
−
After transport, site the device in place where possible two
hours before putting it into operation so that, if necessary, oil
deposits can form again and the compressor can develop its
maximum power.
−
Do not cover the ventilation openings.
−
Keep a distance of at least 40 cm free on all sides of the de-
vice.
−
Set the flow distribution to INT so that during operation as a
bath thermostat (without external consumer) the flow is dis-
charged from the opening for the internal bath circulation.
−
Plug the appliance connector of the cooling underpart into the
appropriate socket 51H and the control cable into the connec-
tion socket at the back of the operating panel.
−
During operation as a bath thermostat without an external
consumer and with the pump connection set fitted, the outflow
nozzle of the pump connection set must be closed (use seal-
ing plug) or connected to the return nozzle with a hose.
−
For bath temperatures above 70 °C attach the sticker included
in the supplied items to an easily visible point on the bath.
.
−
Operation with external consumer (
Ì