ECO Silver
27 / 124
Operation with cooling coil
For the optional operation with the cooling coil (LCZ 0720 and LCZ 0721) mount the cooling coil as follows:
Cut the thread with the enclosed screw
–
Cut the thread on the holed flange already before assembly.
The cooling coil can only be mounted on one side of the control head.
This is located on the side with the mains switch (refer to illustration).
–
Withdraw the mains plug.
–
Use a soft underlay to avoid scratches to the upper side of the
control head.
–
To fit the cooling coil loosen the two cross-head screws on
the blind flange and remove it.
–
Place the flange of the cooling coil in the position of the re-
moved blind flange and push the holed flange underneath it.
Holed flange
–
With the two cross-head screws, mount the carrier plate of
the cooling coil and the holed flange to the underside of the
control head.
Note: Use the cooling coil with cooling water only at operating temperatures below 100 °C.
At higher temperatures there is danger of hot steam forming!
For operation with an external consumer follow the connection instructions (
Summary of Contents for ECO Silver E 10 S
Page 1: ...ECO Silver Operation manual ...
Page 2: ......
Page 4: ......
Page 78: ...78 124 ECO Silver 10 2019 i ...
Page 79: ...10 2019 i ECO Silver 79 124 ...
Page 80: ...80 124 ECO Silver 10 2019 i Appendix with settings ...
Page 111: ...10 2019 i ECO Silver 111 124 5 Click on Continue installation 6 Click on the key Finish ...
Page 113: ...10 2019 i ECO Silver 113 124 ...
Page 120: ...120 124 ECO Silver 10 2019 i Blank page ...
Page 121: ...10 2019 i ECO Silver 121 124 Blank page ...
Page 122: ...122 124 ECO Silver 10 2019 i ...
Page 125: ......
Page 126: ......
Page 127: ......