Proline Kryomats
26
Preparation
YAUE0007 / 2/26/2009
6
Preparation
6.1
Assembly and siting
)
−
Site the unit on a flat surface
−
The unit must not be put into operation if its
temperature during storage or transport has dropped
below the dew point.
Wait for about one hour.
−
The unit may NEVER be overturned nor put upside
down!
−
Do not cover the ventilation openings at the back of
the control head and on all sides of the lower section
of the unit.
−
Leave at least 40 cm of free space on all sides.
−
For operation as bath thermostat, set the bypass valve
to internal (operation without external loads) (
Ö
−
Plug the mains-cable from the Master control element
to the refrigerator unit into the socket 52H on the back
of the Kryomat.
−
Plug the LiBus connector of the Command control
element into the 70S socket and secure it.
−
Plug the LiBus cable from the refrigerator unit also into
the socket 70S on the back of the Master control
element and secure it.
Operation with external loads
(Circulating thermostat) continue at
Ö
−
Check whether the pump connectors at the side and back are fitted with sealing
caps (
Ö
3) or that hoses are fitted for external loads.
−
Using bath temperatures over 70 °C the supplied self-adhesive label
should be applied on the bath at an easily visible point.
−
Do
not carry out technical changes on the device!
The edge of the bath must not be drilled!
)
−
It is essential to keep within the permissible ambient temperature range (
Ö
−
An increased ambient temperature or increased cooling water temperature
reduces the cooling capacity.