Rev. 4.00 December 2014
Software version 1.04
Part 1 • Page 13-2
Hot disinfection
Part 1 – Operating Instructions
EcoRO Dia I/II (HT)
Part 1 • Chap
ter 13
1. Operating displays for Hot RO I
2. Operating displays for Hot RO I + II
Dialysis operation is only possible once the complete system has reached the pre-programmed cooling
temperature ( see Menu 12).
“Heat up” operating phase
The temperature measurements at the sensors TISAH1and TISAH2
are indicated alternately.
“Hold temperature” operating phase
“Cooling” operating phase
“Heat up” operating phase
The temperature measurements of the sensors TISAH 1 and TISAH2
are indicated alternately.
“Hold temperature” operating phase
“Cooling” operating phase
wd dd.mm.yy ss:mm
HotRO I
Heating
TISAH1(2)
XXX°F
Menu Cool Dial
wd dd.mm.yy ss:mm
HotRO I
Hold temp.
TISAH1 XXX°F
Menu Cool Dial
wd dd.mm.yy ss:mm
HotRO I
Cooling
TISAH1 XXX°F
TISAH2 XXX°F
Menu Dial
wd dd.mm.yy ss:mm
HotRO I/II
heating
TISAH1 XXX°F
TISAH2 XXX°F
Menu Cool Dial
wd dd.mm.yy ss:mm
HotRO I/II
hold temp
TISAH1 XXX°F
TISAH2 XXX°F
Menu Cool Dial
wd dd.mm.yy ss:mm
Cooling HotROI/II
TISAH1 XXX°F
TISAH2 XXX°F
Menu Dial
NOTICE
The cooling down phase after hot sanitation can take up to 3 hours.