Menu selection
Part 1 • Page 14-7
Part 1 – Operating Instructions
Rev. 4.00 December 2014
Software version 1.04
EcoRO Dia I/II (HT)
Part 1 • Ch
apter 14
14.7 RO start options, menu item 7
Parameter
Function
Range
Default setting
Recirculation time
Duration of circulation operation / agitation after the
cleaning agent has been added
0…120 min
10 min
Reaction time
Standstill time for reaction of the cleaning agent
0…120 min
20 min
Activate M3
only (Eco)RO Dia II:
Possibility of activating
pump M3 for cleaning:
1 = yes / 0 = no
1/0
0
Cancel cleaning
Possibility of using “<<” to cancel cleaning?
1 = yes / 0 = no
1/0
1
As a rule, RO operation is protected in terms of personal protection
and functional safety (e.g. pump protection, temperature protection).
However, certain variables that also serve as a requirement for starting
osmosis can be freely selected by the operator.
Parameter
Function
Range
Default setting
LSHAL1 start
System start when level of LSHAL1
(lower level switch in the tank) has been exceeded?
1 = yes = permitted
0 = no = start only when LS2 (upper level switch)
has been reached
1/0
1
Leak monitoring
Autostart with leak monitor
1 = yes / 0 = no
1/0
0
Max. permeate con-
sumption
The system stops automatically when maximum
permeate consumption is reached
0…5000 l/gpm
0 l/gpm
Monitoring delay
The leakage monitor is time-delayed
0…60 min
0 min
End of monitoring
End of leakage monitoring: autostart after x min
0…60 min
0 min
Silicate factor
Selection of silicate factor of the feed water
0 = off
1 = silicate < 7.5 mg/l
2 = silicate 7.5–15 mg/l
3 = silicate > 15 mg/l
0/1/2/3
1
Special shutdown
rinsing
Shutdown rinsing before changeover:
Dialysis mode to standby mode
1 = yes -> 3x em filling of the tank
0 = no -> 1x em filling of the tank
1/0
0
LSHAL1 start
Leakage monitoring
Max. perm. consumpt.
Monitoring delay
End of monitoring
Silicate factor
Spec. shut-off rinse
Factory settings?
<<
OK