Work prior to commissioning
Part 2 – Supplementary Operating Instructions
EcoRO Dia I/II (HT)
Part 2 • Chapter 3
3.1.4.1
Installation summary
3.2
System setup and installation
The system is set up on a flat surface near the power and water connections provided. Make sure that the
connections and control elements are easily accessible (electrical supply cable: 5 m).
Aquaboss
6
T3
5
L3
4
T2
3
L2
2
T1
1
L1
N
N
N
N
PE
PE
PE
PE
-Q
L1 L2 L3 N PE
-F
1
3
5
N
2
4
6
N
-F
Building installation
Reverse osmosis room
External power switch
The power switch must not interrupt
the earthing conductor!
The switch must be near the device and
be easily accessible for the operator.
The seperator must meet the
requirements in accordance
with IEC 60947-1 and IEC 60947-2.
The funktion of the switch as seperator
of the RO from the mains must be marked
by a label.
Ground fault protector
30mA/4-pole
Pre-fuse
Heed nationals regulations and those of
local network operators for on-site installation.
Important
Important
EcoRO Dia II HT
Wiring diagram for the
connection cable look
at circuit diagram
87 243 xx page 15.
Device type
Voltage
Capacity
Current
EcoRO Dia II (HT) 700
3~N PE 208V 11.54 kVA
31 A
EcoRO Dia II (HT) 900
3~N PE 208V 11.54 kVA
31 A
EcoRO Dia II (HT) 1050
3~N PE 208V 14.92 kVA
41 A
EcoRO Dia II (HT) 1400
3~N PE 208V 13.19 kVA
36 A
EcoRO Dia II (HT) 1800
3~N PE 208V 14.92 kVA
41 A
EcoRO Dia II (HT) 2100
3~N PE 208V 16.58 kVA
45 A
EcoRO Di a II (HT) 2450
3~N PE 208V 16.58 kVA
45 A
EcoRO Di a II (HT) 2800
3~N PE 208V 16.58 kVA
45 A
EcoRO Di a II (HT) 3600
3~N PE 208V 16.58 kVA
45 A