background image

EN

2

EN

 General installation instructions

User manual

Protection from damage 
Instructions for use

These instructions for use must be 

carefully read before installation.

Check on content of delivery and condition of the 

components

Check delivery after receipt for completeness and 

possibly damage (see parts list on page

 

4). Inform the 

dealer immediately when damage is apparent. We are 

not liable for damage arising during or after installation/

fitting.

 

Check door width before starting work

Does the bath pass trough the door of the room in 

which the bath will be installed? Required minimum 

door width: See dimensions page 3.

Lifting/moving

The bath must only be lifted/moved using the transport 

straps provided - never use the hoses or installation 

parts.

Laying circuits

Do not lay any circuits under the bath.
Use suitable protective covers to prevent damage to 

surfaces and blockages by dirt or dust arising during 

fitting.

 

Cover sensitive components (drain) temporarily 

with a protective cover before starting the installation/

fitting.

Special precautions

When cleaning the tiles, make sure that no ammoniac 

or a similar aggressive cleaning agent come into 

contact with the installed parts.

Water connection through the overflow.

This connection must absolutely be effected by a 

qualified specialist.
After connecting the water supply and drainage 

pipes, the tub must be examined to ensure that it is 

waterproof.

Changes allowed: 

Laufen reserves the right to 

make changes or modifications on any of its products 

without notice.

Summary of Contents for ALESSI 2.4597.1.000.000.A

Page 1: ...ability only when assembled by an approved specialist in accordance with the instructions and local regulations Bathtub EN IL BAGNO ALESSI Sentec solid surface Australia New Zealand EN Art No 2 4597 2...

Page 2: ...lifted moved using the transport straps provided never use the hoses or installation parts Laying circuits Do not lay any circuits under the bath Use suitable protective covers to prevent damage to s...

Page 3: ...2 4 60 2 4 60 2 50 2 36 60 mm G 1 1 2 0 98 25 mm 2 4597 1 000 000 A 2 4597 2 000 000 A 2587 Ib 310 kg G 1 1 2 Art No 2 4597 2 000 000 A Art No 2 4597 1 000 000 A 23 5 590 0 5 12 18 460 65 4 1660 32 3...

Page 4: ...EN 4 EN Parts list Art No 2 9497 3 000 000 A Art No 2 9511 7 004 000 1 c a b b a c b a 01 02 Art No 2 4597 2 000 000 A 0 08 3 03 EN Tub assembly installation instructions...

Page 5: ...b a c G 1 1 2 05A 04 06A only for state Victoria MAX MAX 07 a b 1x EN Tub assembly installation instructions The following red marked installation components are not included in delivery They are show...

Page 6: ...EN 6 24 h c b a 12 11 09 08 1x a b 10 EN Tub assembly installation instructions...

Page 7: ...EN 7 EN Parts list Art No 2 9033 7 000 000 1 4x 4x 2x 10 10 45 32 8 2 x a b c 03 02 01 05 04 Art No 2 4597 1 000 000 A EN Tub assembly installation instructions...

Page 8: ...instructions The following red marked installation components are not included in delivery They are shown as examples to identify a proper installation a b c b a c G 1 1 2 07A 06 08A 40 42 mm a b G 1...

Page 9: ...EN 9 14 12 a b 13 1x EN Tub assembly installation instructions 11 15 24 h b a a 16 MAX MAX 10 a b 1x...

Page 10: ...t cure for at least 12 hours at minimum 15 C Rub the cured filler with a 220 grain glass paper and also the part around to eliminate any non homogene ous parts Clean the surface as described above Dam...

Page 11: ...en at www laufen com usa or www laufen com canada or send the defective product with a written explanation to Laufen International INC Laufen Bathrooms AG 11190 NW 25th Street Suite 100 Miami Fl 33172...

Page 12: ...Laufen Bathrooms AG Wahlenstrasse 46 CH 4242 Laufen Switzerland www laufen com Controllers name Date Fabrication number 30 11 2015 2 9497 5 000 000 A PLU...

Reviews: