LAUNCH
TLT830WA INSTALLATION MANUAL
7
3 Tools for Installation
and Adjustment
Tools
Model
Level Bar
L=400
(
15.7″
)
Chalk Line
10mm
(
0.4″
)
Taper Plunger Chip
Hammer
1.5 kg (3 lb)
Crescent Wrench
40mm
(
1.6″
)
Open end Wrench Set
11mm-23mm
(
0.43″-0.9″
)
Allen Wrench Set
2mm
~
12mm
Screwdriver
150mm
(
5.9″
)
Rotary Hammer Drill
20mm
(
0.8″
)
Hard Alloy Drill Bit
Φ19mm
(
0.75″
)
Frame Level
(
JB3239-83
)
300X40X300(11
.8″×0.16″×11.8″)
4 Unpacking
This machine consists of four parts: master platform
with hydraulic hoses, slave platform with hydraulic
hoses, one electrical control desk, and drive-on ramp
with hanging plate(this part is unavailable if the lift is
installed under the ground).
Unpack according to the instructions on the packages.
Remove the packing materials and check for damage
and loss of components.
To avoid accidents from occurring, keep the packing
material away from children. The packing materials
need to be disposed of properly if they may
contaminate the environment.
5 Installation of the Lift
5.1 Overall Position
select lift installation site by the procedure listed below
:
The lift can only be installed on the concrete slab, the
minimum thickness of the concrete slab is 200mm
(
7.9″
)
, and the minimum solidification time is 7
days.
The basic intensity of the concrete slab should reach
3000PSI
(
2.1kgf/mm2
)
.
The tolerance of the concrete floor levelness should
not exceed 5mm (0.2”). Slight slope can be
corrected with shims. Excessive slope on the
ground will greatly affect the performance of the lift.
In this case, new concrete slab should be made.
Inspect for possible hindrance such as low ceiling,
overhead pipelines in the work area, passageways
and escapes. The working area of the lift should be
4m high to give enough space.
Allow enough space at the front and back of the lift so
that operation should not be hindered (Fig. 6).