LAUNCH VALUE-100 A/C Service Station User’s Manual
(recommended for the majority of A/C systems), but may be
modified as explained below. Press SEL until the “Vacuum” LED
lights, then press ENTER; at this point the first digit on the left of
the display will begin to flash. Press the + key until the desired
digit appears. Likewise, press the ARROW and + keys to change
the other digits. When setting is complete, press the ENTER key
to confirm the vacuum time value.
2)
During the vacuum phase, the display will clock its
duration. Leave the machine running until the display reads 0000
and the pump stops automatically.
3)
Close all the taps and read the vacuum value on
pressure gauges (A1) and (A2). Wait for about 2 minutes, then
check that the pressure has not increased during the interval. An
increase in pressure signals leaks in the A/C system. Locate and
eliminate the leaks; repeat the vacuum phase.
NEW IL REINTEGRATIN
1)
Measure the quantity of oil extracted from the A/C
system and check that the new oil container (e) contains at least
20 cc more than this quantity.
2)
Open the high- and low-pressure taps (or in the case of
a single coupling, only the relative tap).
3)
Open the tap of the new oil container and keep it open
until the quantity of oil extracted during the recovery phase has
been replaced.
4)
When the correct quantity has been reintegrated, close
the new oil tap.
ATTENTIN:
the level of the oil in the container will fall, and
consequently the quantity must be calculated by subtraction. Upon
termination of the oil reintegration operation you may go on to the
refrigerant fluid charging/reintegration phase.
CHARGING/REINTEGRATIN PHASE
During this phase, the refrigerant fluid is returned to the A/C system
circuit.
1)
Press the SEL key until the “Charging” LED lights.
2)
Proceed as described below to set the quantity of
refrigerant fluid to be charged.
a.
Press the ENTER key. The first digit on the left of
the display will begin to flash. Press the + key until the
desired value appears. Likewise, press the ARROW and +
Summary of Contents for VALUE-100
Page 1: ...A C Service Station VALUE 100 LAUNCH USER SMANUAL Launch Machinery Co Ltd...
Page 3: ...LAUNCH VALUE 100 A C Service Station User s Manual 1 392 89 1...
Page 4: ...LAUNCH VALUE 100 A C Service Station User s Manual 2 1 1060 500 520 80 70dB A...
Page 6: ...LAUNCH VALUE 100 A C Service Station User s Manual 4 80 A C A C R134a R134a R134a...
Page 18: ...LAUNCH VALUE 100 A C Service Station User s Manual 16 200 3 16 18 3 i 7 5 40 10 5 ENTER...
Page 20: ...LAUNCH VALUE 100 A C Service Station User s Manual 18...
Page 38: ...LAUNCH VALUE 100 A C Service Station User s Manual...
Page 39: ...LAUNCH VALUE 100 A C Service Station User s Manual...
Page 40: ...LAUNCH VALUE 100 A C Service Station User s Manual...
Page 41: ...LAUNCH VALUE 100 A C Service Station User s Manual...
Page 42: ...LAUNCH VALUE 100 A C Service Station User s Manual...
Page 43: ...LAUNCH VALUE 100 A C Service Station User s Manual...
Page 44: ...LAUNCH VALUE 100 A C Service Station User s Manual...
Page 45: ...LAUNCH VALUE 100 A C Service Station User s Manual...
Page 46: ...LAUNCH VALUE 100 A C Service Station User s Manual...
Page 47: ...LAUNCH VALUE 100 A C Service Station User s Manual...
Page 50: ...A C Service Station VALUE 100 LAUNCH Launch Machinery Co Ltd...