Launch
X-631 Wheel Aligner Maintenance Manual
Summary Table of Maintenance and Testing Items
1-1
Summary Table of Maintenance and Testing Items
Client
Manufacturer
Launch
Service No.
Main unit serial No.
Maintenance and testing for cabinet assembly
1
Visual inspection for cabinet
2
Cabinet wiring inspection
3
Power supply inspection
4
Power supply switch inspection
5
Charging socket inspection
6
Switch power supply inspection
7
Power strip inspection
8
Computer inspection and cleaning
9
Mouse and keyboard inspection and cleaning
10
Computer system inspection and disk maintenance
11
RF emitter/receiver box inspection
12
Antenna and RF cable inspection
13
Printer inspection
Maintenance and testing for measurement probe rod
14
Visual inspection and cleaning for probe rod
15
Level bubble inspection
16
LCD display screen inspection
17
Battery Inspection
18
Wheel clamp axle inspection
19
Acrylic panel and key-press board inspection
20
Aluminum frame inspection
21
Testing for wireless communication function
Maintenance and testing for some components
22
Mechanical turntable inspection
23
Wheel clamp inspection
24
Brake pedal depressor inspection
25
Steering wheel holder inspection
26
Result Adjustment: √ OK Δ Handle at site R Return to Factory