USAGE
> UNPACKING
Take out the upper and the lower hooks, which
fix the cardboard box to the pallet, take the
cardboard box off, put two wheels of the ma-
chine on ground and take the pallet off.
> DESCRIPTION OF THE MACHINE
(see fig.
ABC
)
①
Burner switch
②
Regulator burner
③
Handle
④
Electric cable
⑤
High pressure water outlet
⑥
Water inlet + filter
⑦
Diesel tank
⑧
Rubber hose fitting
> INSTALLATION AND START-UP
FILLING UP WITH FUEL
Fill the tank with the fuel indicated on the tech-
nical data plate (Diesel)
⑦
Avoid that the tank is empty when the machi-
ne is running i n order not to damage the fuel
pump.
•
WARNING: Incorrect fuel shall not used as
they as provide hazard.
> INSTALLATION
(fig.
E
)
• Connect the plug to the power socket.
• Before connecting the boiler to a high
pressure cleaner, it is necessary to check
that the accessories of them (high pressure
hose, gun and lance) are suitable to operate
at the maximum temperature foreseen by
the boiler (140 ° C). Otherwise it is necessary
to replace them with accessories equipped
with the appropriate temperature marking.
For information contact technical services.
>
POSITIONING OF THE CHIMNEY FOR
INDOOR APPLICATION
(see fig.
M
)
•
WARNING: In case of operation indoors,
adequate ventilation and gas venting must
be assured.
- The chimney section A must be 3 times the
outlet chimney of the machine B and at
distance of at least 20 cm.
-The exausts contain sulphuric acid,
condensating at a temperature of
approximately 180° C. The condensation
shall be avoid, but in any case the condensate
from chimney shall not enter the machine.
CHIMNEY SECTION: 3 times the area of chimney.
Chimney pipe diameter = 150 mm.
CHIMNEY SECTION FOR 2 BOILER: 6 times the
area of chimney.
Chimney pipe diameter = 225 mm.
> 1ST START-UP
When starting up for the first time or after a
long period out of use, connect the intake line
only for a few minutes so that any dirt is vented
from the delivery outlet
> START-UP
(fig.
E
)
• Whenever using the high-pressure cleaner,
users are urged to hold the gun in the correct
position, with one hand on the grip and the
other on the spray rod.
EN
17
Summary of Contents for Vulcano
Page 5: ...5 1 2 3 5 4 6 7 fig G...
Page 6: ...6 fig M min 120 max 5 m A 3B A min 20 cm min 7 9 inch OK B...
Page 50: ...Boiler 01 02 03 04 05a 05b 5 05c 05d 05e 06 30 cm 07 08 09 A S S 2 10 A S S EL 50...
Page 51: ...XJ 0 OFF KL 1 5 11 0 OFF 112 13 14 15 17 18 19 20 21 22 23 24 XZ XX XY EL 51...
Page 53: ...F 11 12 5 10 E 0 OFF 140 C M 20 cm 180 C 3 150 mm 2 6 225 mm 1 E EL 53...
Page 54: ...G 30 15 10 Optional 180 200 3 4 3 4 EL 54...
Page 55: ...EL 55...
Page 56: ...EL 56...
Page 57: ...2012 19 E 12 E 2012 19 EU EL 57...
Page 72: ...01 02 03 04 05a 05b 5 05c 05d 05e 06 30 07 RU 72...
Page 73: ...19 20 21 22 23 24 XX XY XJ 08 09 A S S 2 10 A S S stand by 5 11 OFF 12 13 14 17 18 RU 73...
Page 75: ...ABC P Diesel E OFF 140 C M 5 B 20 180 3 150 2 6 225 RU 75...
Page 76: ...E ON P F 30 15 10 G 180 200 RU 76...
Page 77: ...3 4 3 4 RU 77...
Page 78: ...RU 78...
Page 79: ...12 2012 19 EU RU 79...
Page 100: ...100 3 13 1 2 30 40 1 IEC 60364 1 0 03 A 30 ms 0 H VV F XY XJ Diesel Diesel 12...
Page 102: ...102 1 01 02 03 04 M 5 20 180 3 150 6 225...
Page 104: ...104...