13
4.
Insert diagonal braces
19
and access deck
24
. The diagonal bracing
arrangement is shown for the tower models (Section 4).
5.
Ascend to the next level and fit additional guardrails
16
on the second rung above the platform area.
3.
Swing the ladder frame
11
with guardrails
16
upwards, fit it
in place and secure it with spring clips.
Repeat the following assembly steps 1 to 5 several times
depending on the assembly height.
1.
Fit a first 2.00 m ladder frame
11
and secure it using spring clips
15
.
2.
Attach the Uni assembly hooks
29
and position the second ladder
frame
11
for assembly of the guardrails
16
.
Assembly of intermediate platforms
All tower models
Summary of Contents for ZIFA
Page 15: ...15...
Page 31: ...31 14 ZERTIFIKAT...
Page 47: ...15...
Page 63: ...31 14 CERTIFICATE...
Page 79: ...15...
Page 95: ...31 14 CERTIFICADO...