Operating Instructions – LBAT10/20/PMR – Version 2017
26
9
Commissioning and adjustment
9.1
Introduction:
The turnstiles are tested and adjusted in the factory. However, an adjustment on site may be necessary
to optimise the turnstile.
9.2
Commissioning the turnstile
To commission the turnstile once it has been connected electrically, simply close the main disconnector
and the circuit breakers by raising the switches.