Operating Instructions – LBAT10/20/PMR – Version 2017
39
13.1.1
Step 1: mechanical modification of the configuration of the electromagnets
To change the configuration (here, direction 1), simply inverse the rod and the ratchet:
A-
Remove the four M6 lock nuts holding the ratchet control rod
B-
Remove the M12 lock nut holding the ratchet
C- Remove the rod and ratchet and pivot them 180°
D- Replace the rod and ratchet on the support taking care with the rod’s position on the
electromagnet:
-
Ratchet open -> rod below the electromagnet
-
Ratchet closed -> rod above the electromagnet
E-
Reinstall the M6 and M12 nuts
A
B
C
D
E