56
(c) Short oC, oN, mN, and bN on the top connection terminal row of POD with the copper sheet
“POD-4”.
(d) Short mA, bA, bB and bC on the top connection terminal row of POD with the copper sheet
“POD-5”.
(e) Short oA, oB and oC on the UPS connection terminal row with the copper sheet “UPS-4”.
(f) Short oN, mN, and bN on the UPS connection terminal row with the copper sheet “UPS-7”.
(g) Short bA, bB and bC on the UPS connection terminal row with the copper sheet “UPS-5”.
(h) Connect oA and oB on the bottom connection terminal row of POD to the copper sheet “UPS-
4” with cables.
(i) Connect
oC
, oN, mN, and bN on the bottom connection terminal row of POD to the copper
sheet “UPS-7” with cables.
(j) Connect bA, bB and bC on the bottom connection terminal row of POD to the copper sheet
“UPS-5” with cables.
(k) Connect mA, mB, mC and PE on the bottom connection terminal row of POD to the
corresponding positions on the UPS.
3. POD for parallel system