Page
14
Mini Tower
| Assembly Guide
Step 9
From the platform, fit the two end
frames. Ensure that the head fitting
are pointing inwards and the locking
bolts at the bottom of the installed
frames are in the locked position.
Step 10
Remove the brace panel and fit it on
the same side as the hanger frame
it comes off between rungs 6 and 8
above the current platform. Ensure
the hooks face outwards. Relocate
the empty hanger frame onto the
newly fitted brace panel. Take the
second platform off the end of the
tower and fit it 8 rungs above the
current platform. Engage the wind
latches.
Step 11
Transfer the toeboard and two brace
panels up to the hanger frame fitte
in step 10 - in that order.
Using the 3T method, add the two
brace panels above the top platform
so the top rung of the brace panel is
in line with the top rung of the frames
with the lower hooks above the 3rd
rung down. Finally, fit the toeboard to
the platform.
Summary of Contents for 1298-IM-EN
Page 19: ...Page 19 Products LEACH S Notes...