Page
18
Mini Tower
| Assembly Guide
Dismantling
Disassembly is the reverse of the relevant assembly process until you reach an assembled base unit
as described in step 3.
Ensure that the 3T method is used at all times.
The toeboard should be secured in the closed position using the Velcro strap provided after removal
from the platform before proceeding further with the dismantling.
Packing & Transportation
The base unit is designed to contain all the components for your Mini Tower.
Once your tower is disassembled to the base unit stage shown in step 3, add a brace frame on the
opposite side to the folding gate. Ensure that the hooks face outwards.
Fit the toeboard to the platform in the base of the unit.
Fit the hanger frames to each end frame facing inwards on the top rung. Place the brace frames
onto the hanger frames sideways on.
Stack the end frames in the centre of the unit between the brace frames.
Add the second deck in front of the end frames and the stabilisers in front of the platform.
The stored configuration of the Mini Tower is now complete.
Summary of Contents for 1298-IM-EN
Page 19: ...Page 19 Products LEACH S Notes...