INTRODUCTION
SECTION 2
WINCH
1. Control lever
2. Engine speed up button
3.
4.
5.
Cable
6.
Winch assembly
Container attachment
Stop bar/Lid guard
CONTAINER LIFTING CYLINDER (CLC)
1. Control lever
2. Engine speed-up button
3. Roller guide
4.
5.
6.
Cable
7.
Lifting cylinder assembly
Container attachment
Stop bar/Lid guard
CONTAINER PUSH BAR (CPB)
1. Control lever
2. Push bar
3. Lift roller
4. Container dumping cylinder
5. Stop bar/ Lid guard
6. Container attachment
3
5
6
3
2
4
1
2
5
3
4
6
1
2
4
5
6
7
1
2-6
Summary of Contents for 2R-II
Page 1: ...2RII PACKMASTER OPERATORS MANUAL Over Serial Number 16000 BUILDING THE BEST...
Page 2: ......
Page 11: ...1 6 SAFETY PRECAUTIONS SECTION 1 1 4 2 5 6 3 7 8 9 10 7 7 9 1 8 4 5 2 6 10 1 3 1 6...
Page 12: ...SAFETY PRECAUTIONS SECTION 1 2 1 3 4 5 1 2 3 4 5 1 7...
Page 14: ...SAFETY PRECAUTIONS SECTION 1 11 12 13 14 15 16 17 18 19 20 21 22 23 1 9...
Page 16: ...SAFETY PRECAUTIONS SECTION 1 1 11...
Page 17: ......
Page 25: ......
Page 27: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 1 2 3 8 9 10 11 12 7 4 5 6 7 8 3 2...
Page 46: ......
Page 48: ......
Page 49: ......