OPERATION
SECTION 3
OPERATING PROCEDURES
This section of the manual provides all the instructions
necessary to start and operate the 2RII Packmaster,
including specific instructions for loading, packing and
unloading the unit.
NOTE
It is important that operators and mechanics understand
these procedures.
PRE-OPERATING WALK-AROUND
INSPECTION
Each day, before starting the unit, perform the following
walk-around inspection.
1. Refer to the decal location illustration in Section 1,
SAFETY, of this manual and make sure all decals are in
place and readable. Replace any decals that are not.
NOTE
A decal kit, free of charge, is available from your local
authorized Leach distributor.
2. As you are checking for decals, also look for fluid
leaks on and around the unit. Check for fluid leaks at the
hydraulic cylinders, valves and fittings.
3. Inspect the mounting sills and attaching hardware.
Make sure everything is tight and that there are no bro-
ken or excessively worn parts. Check capscrews and
fasteners for looseness, visible welds for cracks and
control levers for each movement.
SPRINGS
3-6
Summary of Contents for 2R-II
Page 1: ...2RII PACKMASTER OPERATORS MANUAL Over Serial Number 16000 BUILDING THE BEST...
Page 2: ......
Page 11: ...1 6 SAFETY PRECAUTIONS SECTION 1 1 4 2 5 6 3 7 8 9 10 7 7 9 1 8 4 5 2 6 10 1 3 1 6...
Page 12: ...SAFETY PRECAUTIONS SECTION 1 2 1 3 4 5 1 2 3 4 5 1 7...
Page 14: ...SAFETY PRECAUTIONS SECTION 1 11 12 13 14 15 16 17 18 19 20 21 22 23 1 9...
Page 16: ...SAFETY PRECAUTIONS SECTION 1 1 11...
Page 17: ......
Page 25: ......
Page 27: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 1 2 3 8 9 10 11 12 7 4 5 6 7 8 3 2...
Page 46: ......
Page 48: ......
Page 49: ......