OPERATION
SECTION 3
7. Start the truck according to the manufacturers instruc-
tions and while it is warming up, continue the walk-around
inspection.
8. Check all of the operating and running lights. Make
sure none are missing and that there are no burned out
bulbs.
The tailgate open warning light should be off.
Do not operate the unit if the light is illuminated.
Never place hands in or near the packer panel dur-
ing operation.
9. With the engine running, the speed-up solenoid switch
ON, the PTO engaged and the transmission in neutral
and the brakes applied, depress the speed-up push-but-
ton on the forward left (street) side of the body. You should
hear the engine speed-up.
Never hold the packer or the carrier panel lever
in position by hand. Always engage and let go
immediately. The only exception is at the end of
a load.
PUSHOUT LEVER
FRONT
CONTROL
VALVE
TAILGATE
LIFT
LEVER
ENGINE SPEED UP
BUTTON
3-8
Summary of Contents for 2R-II
Page 1: ...2RII PACKMASTER OPERATORS MANUAL Over Serial Number 16000 BUILDING THE BEST...
Page 2: ......
Page 11: ...1 6 SAFETY PRECAUTIONS SECTION 1 1 4 2 5 6 3 7 8 9 10 7 7 9 1 8 4 5 2 6 10 1 3 1 6...
Page 12: ...SAFETY PRECAUTIONS SECTION 1 2 1 3 4 5 1 2 3 4 5 1 7...
Page 14: ...SAFETY PRECAUTIONS SECTION 1 11 12 13 14 15 16 17 18 19 20 21 22 23 1 9...
Page 16: ...SAFETY PRECAUTIONS SECTION 1 1 11...
Page 17: ......
Page 25: ......
Page 27: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 1 2 3 8 9 10 11 12 7 4 5 6 7 8 3 2...
Page 46: ......
Page 48: ......
Page 49: ......