Leach Company has been a leader in the refuse industry for over 110 years. Leach refuse
bodies are the industry standard for both quality and performance. Leach Company is justifi-
ably proud of the quality engineering, material and workmanship that goes into each and every
packer we produce. This commitment to quality extends to the best parts, service and distribu-
tor organization in the industry.
One area of great importance to us is your safety. This unit was built in accordance with the
American National Standards Institute (ANSI) standard for Mobile Refuse Collection and Com-
paction Equipment-Safety Requirements, ANSI Z245.1-1992. Before operating this unit please
read and understand the safety precautions found in Section 2 of this manual. They are
important and are provided to assist you in the safe operation of the unit.
This manual was produced with the intention of providing clear, concise instructions for the
proper operation, maintenance and service of your 2RII refuse packer. It was produced with
the latest information available at the time of publication. We do, however, reserve the right to
redesign and/or discontinue the manufacture of parts, components or assemblies at any time.
Leach Company has an aggressive manual and product improvement program. In any conver-
sation or correspondence dealing with the information provided in any Leach manual please
refer to the part number of that manual.
The manuals provided with the unit are considered a permanent part of the unit and should be
included in the event of a re-sale. Additional manuals are available, free of charge, from your
local authorized Leach distributor. These manuals should be kept readily available for easy
reference. We ask that if you have comments or suggestions concerning this manual, please
contact us at (920) 231-2770. We are here to be of service to you, our valued customer.
FOREWARD
III
Summary of Contents for 2R-II
Page 1: ...2RII PACKMASTER OPERATORS MANUAL Over Serial Number 16000 BUILDING THE BEST...
Page 2: ......
Page 11: ...1 6 SAFETY PRECAUTIONS SECTION 1 1 4 2 5 6 3 7 8 9 10 7 7 9 1 8 4 5 2 6 10 1 3 1 6...
Page 12: ...SAFETY PRECAUTIONS SECTION 1 2 1 3 4 5 1 2 3 4 5 1 7...
Page 14: ...SAFETY PRECAUTIONS SECTION 1 11 12 13 14 15 16 17 18 19 20 21 22 23 1 9...
Page 16: ...SAFETY PRECAUTIONS SECTION 1 1 11...
Page 17: ......
Page 25: ......
Page 27: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 1 2 3 8 9 10 11 12 7 4 5 6 7 8 3 2...
Page 46: ......
Page 48: ......
Page 49: ......