100 Service & Repair
7.
Disconnect and plug the hydraulic lines which connect to the case end of the carrier panel
cylinder.
8.
Shift the carrier panel lever inward to apply hydraulic
pressure to the rod end of the carrier panel
cylinders. Hold the lever and observe the fluid flow from the open port on the case end of the
cylinder.
The flow of hydraulic fluid should be no more than 2 fluid ounces per minute. A flow greater than
2 ounces indicates an excessive piston seal leak. Disassemble
the cylinder and replace the piston
seal.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Caution!
Loosen the hydraulic fittings slowly to release any trapped pressure. Watch for inadvertent
movement of components.
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up On
Transmission Neutral
CARRIER
PANEL
LEVER
PLUG
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...