104 Service & Repair
8.
Remove capscrew (1), lockwashers (2), and nut (3)
securing the pivot pin retainer (4) and
remove the retainer.
9.
Remove the pivot pin.
10.
Check for bent pivot pins and inspect pin hubs for broken welds and elongated holes.
Removal of Carrier Panel Cylinders
Procedure:
1.
Remove the top sheet to provide better accessibility.
Remove two capscrews (1), lockwashers
(2) and spacer (3) securing the upper track hole cover (4) and remove the upper covers from
each side of the tailgate.
2.
Shift the carrier panel lever and cycle the unit until
the roller assembly on the upper end of the
carrier
panel is in line with the open upper track hole.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up Off
4
1
3
2
1
2
3
4
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...