106 Service & Repair
5.
Secure a nylon sling around the cylinder and attach
to a lifting device with a lifting capacity of
500
lbs (227 kg). Operate the hoist to snug the lifting cable
without applying strain to the
cylinder.
6.
Slowly operate the carrier panel lever inward to completely
retract the carrier cylinder piston rod.
This
will provide enough clearance to remove the cylinder.
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up Off
OPERATIONAL STATUS
Truck Off
PTO Disengaged
CARRIER
PANEL
LEVER
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...