5.
Inspect the bearing surface for excessive or uneven
wear, scoring or other damage.
6.
Replace a worn bearing assembly.
7.
Install the bearing housing over the packer panel tube and secure to the carrier panel channel
with new through-bolts, shims and nuts. Torque to 900
ft-lbs then tack weld the nuts to the bolts.
8.
Install the grease fitting and lubricate as described in
Roller Replacement
For this task, apply the following procedure:
1.
Shift the control levers and cycle the unit several
times while observing the rollers and action of
the packer and carrier panels. Watch for sideways movement or twisting to determine where
new
rollers may be needed.
2.
Remove capscrews (1), lockwashers (2), spacers
(3) and cover weldments (4) for both upper
and
lower track holes on each side of the tailgate.
Caution!
Check that the packer panel torque tube is straight. Even a slightly bent torque tube may
cause damage to other components. Replace the tube if bent or worn.
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up On
Transmission Neutral
OPERATIONAL STATUS
Truck Off
PTO Disengaged
stall the bearing housing over the packer panel
be and secure to the carrier panel channel with
w through-bolts, shims and nuts. Torque to 900
. Lbs. (1221 Nm.) then tack weld the nuts to the
lts.
stall the grease fitting and lubricate as described
LUBRICATION CHART, Sec. 6, PREVENTIVE
AINTENANCE.
1
3
2
1
2
3
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...