134 Service & Repair
Removal of the Main Control Valve
For this task, apply the following procedure:
1.
Place the packer and carrier panels in the “interrupted cycle” position.
2.
Move the packer panel control lever outward to
sweep the packer panel through the hopper
toward the home position. Stop the movement of the panel (move the control lever to the neutral
position) when
the panel becomes vertical (straight up and down).
MAIN CONTROL VALVE
INTERRUPTED CYCLE POSITION
CARRIER PANEL
PAC
K
ER PANEL
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...