150 Service & Repair
Anytime a repaired area has a repeat failure, suspect that the core problem, whether it is mechanical
or operator, has not been adequately addressed.
Removal of Carrier Panel
For this task, apply the following procedure:
1.
Remove top sheet supports for better accessibility.
2.
3.
Remove the operating cylinders (see
Removal of Packer Panel Cylinders
4.
Remove the tubing to the main control valve. Cap the lines and plug the ports in the valve to
prevent contamination.
5.
Remove the carrier panel.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
REMOVE TOP
SHEETS
CARRIER
PANEL
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...