110 Service & Repair
Bearing Placement
For this task, apply the following procedure:
1.
Move the packer panel lever outward to fully extend
the packer panel cylinders and put the panel
in the “home position”.
2.
Raise the tailgate for access to the bearing through-bolts. Support the tailgate with stands prior to
loosening through-bolts.
3.
Remove the nuts (2) and through-bolts (1).
4.
Remove the bearing assembly (3).
OPERATIONAL STATUS
Truck Running
PTO Engaged
Speed Up On
Transmission Neutral
OPERATIONAL STATUS
Truck Off
PTO Disengaged
PAC
K
ER
PANEL
LEVER
ough-
loos-
BEARING
HOUSINGS
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...