Service & Repair 145
Packer Panel
Removal of Packer Panel
To remove the packer panel, apply the following procedure:
1.
(
If the carrier panel is also to be removed
) - R
emove all four operating cylinders (see
Removal of Carrier Panel Cylinders
and
proceed to step 6.
OR
2.
(
If the carrier panel is NOT to be removed
) - A
ttach a chain connected to a suitable lifting device,
capable of supporting 1600
lbs
(726
kg) to the lower end of the carrier panel as shown. This will
support the carrier panel once the packer panel
is removed.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
OPERATIONAL STATUS
Truck Off
PTO Disengaged
CARRIER PANEL
CYLINDERS
PAC
K
ER PANEL
CYLINDERS
PAC
K
ER PANEL
CARRIER PANEL
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...