6
Check-Out
The
2R-III™
has been designed to provide long periods
of trouble-free operation. Performing the check-out
procedures below, at regular weekly intervals, will help
to
prevent unscheduled downtime.
Figure 6-1
Example of Operational Status block
N
OTE
:
Because of the location of various controls, some
checks will require two people.
Warning!
Make sure you know and observe all safety
precautions
listed in Chapter
2
before
performing any of the following check-out
procedures. Use extreme caution to avoid
coming near any moving parts. Never enter
the body of the unit when the truck is
running. Make sure the unit is in the correct
operational mode as indicated by the
OPERATIONAL STATUS
block presented at the
beginning of each check.
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...