68 Check-Out
Checking Packer High Pressure (Circuit) Relief Cartridge
Use the test fixture and test as shown on illustration.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Attach port-a-power
with 0-6000 psi
gauge to port
marked “P2”
When the adjusted
pressure is reached
(3800 psi), fluid will
drain from port
marked “T2”
Install relief
cartridge in port
marked “WPRV”.
Tighten to 20 ft. lbs
Locking nut
Part #HYV50000
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...