Troubleshooting 87
Packing Refuse (2)
Hydraulic Sequence
While the carrier and packer panels are moving up, compacting
refuse against the pushout panel,
pressure is building in the case end of the carrier cylinders. This pressure is also building in a pilot line
from the carrier valve section to the FCV (Front Control Valve) pushout section. When this pressure
reaches 1800
PSI
(124
BAR), a relief (resistance) cartridge opens in the FCV (Front Control Valve)
pushout section, allowing some case end pressure from the telescopic pushout cylinder to return to
tank. This allows the pushout panel to come
forward slightly.
MAIN
CONTROL
V
AL
V
E
HYDRAULIC
FLUID
TANK
PUMP
FRONT
CONTROL
V
AL
V
E
TELESCOPIC
CYLINDER
TAILGATE
LIFT
CYLINDER
CARRIER
CYLINDER
PACKER
CYLINDER
CARRIER
CYLINDER
TAILGATE
LIFT
CYLINDER
P
.
O
.
CHECK
V
AL
V
E
○
○
○○○○
○
○
○ ○
○
○
○
○ ○ ○
○ ○
○ ○
○ ○
○ ○
○ ○
○ ○
○ ○
○ ○
○○○○○
○○○○○○○○○
○
○
○
○
○○○○○○○
○
○
○
○
○
○
○
PRESSURE
○ ○ ○ ○
RETURN
TRAPPED OIL
○○○○○○
○
○
○
○
○
○
○○○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○○○
○ ○
○ ○
○ ○
○○○○○○○○○○○○○○○○○ ○
○ ○
○ ○
○ ○
○ ○
○ ○
○ ○
○ ○
○ ○
○ ○
○ ○○○
Summary of Contents for 2R-III
Page 1: ...2R III MAINTENANCE MANUAL...
Page 2: ......
Page 3: ...2R III MAINTENANCE MANUAL...
Page 5: ......
Page 6: ......
Page 20: ...10 Introduction...
Page 42: ...32 Safety...
Page 58: ...48 Preventive Maintenance Figure 5 1 Hydraulic tank w return filter 1 2 3 4 5 6 7 8...
Page 66: ...56 Preventive Maintenance...
Page 102: ...92 Troubleshooting...