‘Earth’  the  System  -  The  turbine  tower  should  have  its  own  separate  earth  point.  The 
negative  terminal  of  the  battery  bank  should  also  be  earthed.  This  provides  protection 
against the build-up of static and lightning strikes. The tower should be earthed separately 
with  its  own  ground  rod  if  there  is  a  long  transmission  distance  between  the  tower  and 
batteries. An appropriate surge arrestor could also be used to help prevent damage to the 
battery charging  system during a  lightning strike. Ensure that the earth cables are of the 
same rating as the positive and negative cables. 

 

 

Cable Selection - The cable size table should be used to select the minimum sized cable for 
a given transmission distance. Voltage drop in the cable will be improved if a larger cable is 
used.  

 

 

Fuses  -  The turbine and charging  circuit  should be protected with a  suitably rated ‘slow-
blow’ DC fuse or DC circuit breaker. Please refer to the table below for the correct rating. 
The  fuse  or  breaker  should  be  positioned  between  the  turbine  and  batteries  (on  the 
positive  cable).  If  a  stop  switch  is  used  (recommended)  the  fuse  should  be  positioned 
between the switch and the batteries. 

 

 

 
 
 
 
 
 

 

Run  /  Stop  Switch  -  A  simple  switch  arrangement  can  provide  a  safe  and  easy  way  of 
stopping the turbine for maintenance.  Leading Edge Turbines can supply a switch which is 
best  for  this  purpose.  As  the  switch  is  thrown,  the  batteries  are  disconnected  and  the 
turbine  is  ‘shorted’  reducing  the  rotor  to  a  slow  rotation.  Refer  to  the  generic  wiring 
diagrams. A run / stop switch is optional  on the  LE-v150 turbine. See Appendix for more 
information. 

 

 

Charge  Controllers  – We recommend that the  LE-v150 is  used with our DL-300 diversion 
charge  controller.  A  diversion  charge  controller  works  as  an  'overflow'  for  your  batteries 
and  protects  them  against  becoming  overcharged.  A  diversion  charge  controller  is  a 
separate  electrical  entity  and  is  wired  directly  onto  the  battery  bank  in  parallel  with  the 
turbine.  
 
When the  LE-v150 is to be used in a  hybrid system with  multiple power sources such  as 
solar  PV,  we  recommend  that  you  use  our  45A  diversion  charge  controller  and  separate 
dump load. This provides a flexible system that is able to accommodate different charging 
systems. 

 

We do not recommend that any other type of charge controller is used with the LE-v150 
turbine. This may cause damage to the turbine or the charge controller. 

 

 

Please refer to the following wiring diagrams as a guide. 

 
 
 
 
 
 
 
 

LE-v150 Nominal 

Output Voltage 

DC Fuse / DC Circuit Breaker Rating 

12V 

20 Amp 

24V 

10 Amp 

48V 

  5 Amp 

Summary of Contents for GA-LETU-013

Page 1: ...m Pontrilas Hereford HR2 0BW UK www leturbines com Page 1 of 28 LE v150 LE v150 Extreme Turbine Installation Operation Guide A silent and robust vertical axis wind power for a range of off grid applic...

Page 2: ...lation 10 Turbine Operation 13 Maintenance 15 Spares 16 Warranty 17 Disclaimer 18 Appendix 1 DL 300 Charge Controller User Manual 20 Appendix 2 Run Stop Switch User Manual 24 Warranty Registration Ple...

Page 3: ...on charge controller optional always ensure that the turbine and the controller are connected to the battery separately 3 Don t allow the turbine to run without being connected to the battery Failing...

Page 4: ...to ensure optimum efficiency and a long operating life Specific LE v150 turbine features Innovatively designed axial flux alternator using neodymium iron boron magnets Bearing support at both ends of...

Page 5: ...completed at ground level Ensure that the batteries are disconnected during the installation procedure Twist the turbine output cables together to create a short circuit during the mechanical install...

Page 6: ...Part Number GA LETU 013 Turbine Name LE v150 Extreme Part Number GA LETU 023 Nominal Voltage 12V 24V 48V DC Rotor Diameter 270 mm Rated Wind Velocity 8 m s Rated Output 24 Watts Start up Wind Velocity...

Page 7: ...r dealer immediately Tools Required For Assembly You will require the following tools to assemble your LE v150 turbine 13 mm A F spanner 13 mm ratchet one of each required 8mm A F spanner or ratchet A...

Page 8: ...ly E Retighten the upper and lower stub shaft fixings and check that the turbine still rotates freely F Reposition and fix the cowlings ensuring that they do not rub upon each other The bearing units...

Page 9: ...e turbine removed from the baseboard it can now be fitted in its intended position The LE v150 is supplied as standard with three universal flat mounting brackets Dimensions of the brackets can be fou...

Page 10: ...generic wiring diagrams In a battery charging renewable energy system there may be different ways of wiring small wind turbines photovoltaic panels charge controllers and batteries together This type...

Page 11: ...etween the switch and the batteries Run Stop Switch A simple switch arrangement can provide a safe and easy way of stopping the turbine for maintenance Leading Edge Turbines can supply a switch which...

Page 12: ...Tel 44 0 1981 241668 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 12 of 28 Fig 4 Simple Stand Alone battery charging wiring diagram...

Page 13: ...Tel 44 0 1981 241668 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 13 of 28 Fig 6 Typical Hybrid wind PV System wiring diagram...

Page 14: ...tor speed increases so too will the current and voltage Shut Down If Run Stop switch is fitted A run stop switch is not required with the LE v150 turbine but one can be installed if desired see append...

Page 15: ...If many dents have occurred along the edges of the blades a new set of rotor blades should be fitted part numbers available in the Spares section Remove any build up of dirt and debris from the rotor...

Page 16: ...Dealer and quote the part numbers listed below Rotor Blade set of 3 DP LETU 303 x3 Bearing Housing DP LETU 198 Bearing Service Kit OS 296 Stator 12 VDC SA LETU 005 12V Stator 24 VDC SA LETU 005 24V St...

Page 17: ...rranty and may compromise the safety of the machine What is not covered by your warranty Damage caused by unsatisfactory installation of the turbine tower and or control equipment Damage caused by the...

Page 18: ...side of the chassis Disclaimer All specifications are subject to change without prior notice The information given in this user manual is believed to be accurate and reliable Leading Edge Turbines ass...

Page 19: ...Tel 44 0 1981 241668 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 19 of 28 Appendix 1 DL 300 Charge Controller User Manual...

Page 20: ...The DL 300 Features PWM Pulse Width Modulation for highest charging performance without flicker Selectable three stage charging or over voltage protection mode Selectable for sealed or flooded batter...

Page 21: ...hat the correct size of cable has been selected If a cable of insufficient cross sectional area is used at any point in the electrical system heat will build up in the cables causing a potential fire...

Page 22: ...s should a jumper be applied to pins 2 1 position shown to help locate pins 2 2 Jumper Pins 2 1 Jumper Pins 2 2 Gel type Batteries No Jumper No Jumper Flooded type Batteries No Jumper Connect Jumper U...

Page 23: ...ating The fuse or breaker should be positioned between the DL 300 and batteries on the positive cable DL 300 Voltage Set Points Whilst operating the DL 300 does a multi stage charge based on time and...

Page 24: ...Tel 44 0 1981 241668 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 24 of 28 Appendix 2 Run Stop Switch User Manual Only operate in light winds...

Page 25: ...peated dynamic braking operations The switch has two positions Position 1 Turbine Stop position The turbine is dynamically braked and may be seen to rotate very slowly Position 2 Turbine Run position...

Page 26: ...move batteries by yourself Always use manual handling tools and an assistant Always keep lead acid batteries the correct way up Do not allow the acidic electrolyte to spill or come into contact with y...

Page 27: ...Tel 44 0 1981 241668 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 27 of 28...

Page 28: ...arm Pontrilas Hereford HR2 0BW UK www leturbines com Page 28 of 28 Contact Us Your Local Distributor Leading Edge Turbines Ltd Skyrrid Farm Pontrilas Hereford HR2 0BW UK Tel 44 0 1981 241 668 info let...

Reviews:

Related manuals for GA-LETU-013