Tel: +44 (0)845 652 0396
Skyrrid Farm, Pontrilas, Hereford. HR2 0BW. UK
www.leturbines.com
Page 11 of 47
7)
Fit the Nose Cone - The nose cone can now be fitted to the rotor. This is done by aligning
the five mounting holes of the nose cone with those on the rotor hub plate. Use five M5 x
12 Cap Heads and five M5 washers to secure the nose cone in position - see Fig-9.
Fig-9: Attach the nose cone
8)
Prepare the Turbine Mount - If you have purchased a LE-450 mount bracket or tower from
a Leading Edge Turbines’ dealer, then please refer to the separate installation instructions
supplied with the product. If you have sourced your own tower / mount bracket, 6.5 mm
diameter holes will need to be drilled in order to secure the turbine. These holes should be
drilled 10 mm & 25 mm from the top of the tower / mount bracket and should be
perpendicular to the surface and skewed by 90 degrees. The holes should penetrate both
sides and cross the centre line of the tubular section - see Fig-10.
Fig-10: Drill through top of tower / mount bracket
M5 x 12 Cap
Head Screw +
M5 Washers
Summary of Contents for GA-LETU-016
Page 47: ......