Damage  caused  by  incorrect  connection  to  external  electrical  equipment,  or  failure  to 
observe  current  regulations  concerning  connection  to  external  electrical  networks, 
equipment or any other devices. 

 
If you should experience a problem with your turbine, your first ‘port-of-call’ should be the reseller 
or  installer  from  whom  you  purchased  the  product.  They  should  be  able  to  resolve  the  problem 
quickly  and  efficiently.  If  you  are  unable  to  contact  the  original  reseller,  then  please  contact  us 
directly. 
 
Please  quote  the  serial  number  of  your  turbine  when  dealing  with  warranty  issues.  The  serial 
number can be found on the nameplate positioned on the underside of the chassis. 
 
 
 
 

Disclaimer 
 

 

All specifications are subject to change without prior notice. 

 

The information given in this user manual is believed to be accurate and reliable.  Leading 
Edge Turbines
 assumes no responsibility for omissions or inaccuracies. 

 

The user of this information and product assumes full responsibility and risk. 

 

The LE-450 turbine is a source of electrical power. It must be installed in accordance with 
local  building  and  electrical  regulations.  Consult  your  local  planning  (zoning)  office  for 
details. 

 

The  LE-450  turbine  has  moving  parts  that  may  cause  injury  due  to  poor  installation  and 
unsafe operation. Leading Edge Turbines assumes no responsibility for problems caused by 
unsafe or unsatisfactory installation or operation. 

 
 

 
 

Designed & Manufactured in the UK by: 

Leading Edge Turbines Ltd 

Skyrrid Farm, 

Pontrilas, 

Hereford. 

HR2 0BW 

Tel: +44 (0)1981 241668 

www.leturbines.com

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 

 

Designed in accordance with 

EN BS 61400-2: Safety of Small Wind 

Turbines 

Summary of Contents for GA-LETU-016

Page 1: ...d Farm Pontrilas Hereford HR2 0BW UK www leturbines com LE 450 Turbine Installation Operation Guide 1m Diameter Micro Wind Turbine for generating clean and renewable electricity anywhere the wind blow...

Page 2: ...Installation Checks to be carried out one month after installation 19 Annual Maintenance 19 After five years of normal operation 19 Other Considerations 19 Spares 20 Warranty 21 Disclaimer 22 Appendi...

Page 3: ...ed to the battery separately Ensure the blades are fitted in the correct orientation Consult the diagram on page 9 Blades fitted back to front it will severely impair power production Don t allow the...

Page 4: ...ser cut aluminium chassis using Yaw wing design to ensure responsive yawing and to reduce weight Maintenance free low friction bearing in both main shaft and yaw assemblies Extremely quiet injection m...

Page 5: ...nected during the installation procedure Twist the turbine output cables together to create a short circuit during the mechanical installation process This will prevent the turbine from spinning up du...

Page 6: ...ge 12V 24V 48V DC or Grid tie optimised Rotor Diameter 1000 mm Rated Wind Velocity 8 m s Rated Output 105 Watts Max Output 450 Watts Start up Wind Velocity 2 m s Total weight 8 5 Kg Tower mount 48 3 m...

Page 7: ...tchet one of each required 8 mm spanner or ratchet A set of Metric Standard Hexagon Keys Electrical screw drivers Power drill 6 5 mm diameter twist drill bit suitable for drilling through steel Digita...

Page 8: ...tures of 10 degrees Centigrade or lower this bedding in period will be extended by a further 50 hours of normal operation Connect a digital multi meter to the positive red and negative black output le...

Page 9: ...her is used underneath the anti vibration nuts Three set screws three washers and three anti vibration nuts should be used on each blade Tighten the fixings until the blades are safely secured Do not...

Page 10: ...he rotor hub in position using the six tapped holes in the drive shaft Ensure that all screws are securely tightened and that the rotor blades are fitted with the flat side of the blade facing forward...

Page 11: ...e purchased a LE 450 mount bracket or tower from a Leading Edge Turbines dealer then please refer to the separate installation instructions supplied with the product If you have sourced your own tower...

Page 12: ...ss sectional area is used heat will build up in the cables causing a potential fire hazard Cable capacities quoted below are based upon Tri Rated cables BS6231 Transmission Distance LE 450 Nominal Out...

Page 13: ...ower from the turbine Clip the cables to the inside of the tower Failure to do this will result in excessive mechanical strain on the cable joints within the slip ring assembly and may cause a failure...

Page 14: ...ed in parallel with the battery bank see Fig 13 The Tristar diversion charge controller can then be configured to regulate at a slightly higher voltage than the PV charge controller This will prevent...

Page 15: ...AMMETER OPTIONAL FUSE OR BREAKER RECOMMENDED BATTERY DISCONNECT OPTIONAL TRISTAR DIVERSION CONTROLLER REQUIRED BATTERY BANK WIRED TO APPROPRIATE CAPACITY VOLTAGE TOWER OR SUPPORT STRUCTURE SEE RUN ST...

Page 16: ...be used in conjunction with shore power and engine alternator power sources A LE 450 TURBINE PN GA LETU 016 RUN STOP SWITCH BOX REQUIRED PN GA CTRL 008A AMMETER OPTIONAL FUSE OR BREAKER RECOMMENDED BA...

Page 17: ...al for specific operational instructions Shut Down By activating the stop switch the output from cables of the turbine are shorted together This effectively puts an infinite load on the generator caus...

Page 18: ...ne to run off load with no connection to a battery bank or grid tie inverter Doing so will allow open circuit voltages to be generated by the turbine These voltages may be dangerous and may damage the...

Page 19: ...of stress cracking or fatigue A new set of rotor blades should be fitted if any cracks of fractures have occurred part numbers available in the Spares section Remove any build up of dirt and debris fr...

Page 20: ...t Leading Edge Turbines Dealer and quote the part numbers listed below Rotor Blade set of 5 DP LETU 145 X5 Magnet Rotor SA LETU 031 Stator 12V 24V 48V SA LETU 027 Yaw pivot Slip ring module SA LETU 01...

Page 21: ...ign will void the warranty and may compromise the safety of the machine What is not covered by your warranty Damage caused by unsatisfactory installation of the turbine tower and or control equipment...

Page 22: ...of the chassis Disclaimer All specifications are subject to change without prior notice The information given in this user manual is believed to be accurate and reliable Leading Edge Turbines assumes...

Page 23: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 23 of 47 Appendix 1 Tristar 45 Diversion Charge Controller...

Page 24: ...en performing routine inspection or maintenance always stop the turbine by activating the stop switch Electrical Safety Hazards The Tristar controller and dump load operates with low voltage DC Even a...

Page 25: ...e common sense when installing and operating your turbine and Charge Controller Electrical Installation Please refer to the overall electrical schematic in the turbine installation for appropriate gen...

Page 26: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 26 of 47...

Page 27: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 27 of 47...

Page 28: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 28 of 47...

Page 29: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 29 of 47...

Page 30: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 30 of 47...

Page 31: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 31 of 47...

Page 32: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 32 of 47...

Page 33: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 33 of 47...

Page 34: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 34 of 47...

Page 35: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 35 of 47...

Page 36: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 36 of 47...

Page 37: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 37 of 47...

Page 38: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 38 of 47...

Page 39: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 39 of 47 Appendix 2 Run Stop Switch User Manual Only operate in light winds...

Page 40: ...ition The turbine is dynamically braked and may be seen to rotate very slowly Position 2 Turbine Run position The turbine output is allowed to flow straight through the switch to the relevant output S...

Page 41: ...per these instructions and wiring schematics Incorrect wiring may lead to a short circuit being placed across the batteries which can lead to fire or explosion Please use common sense when installing...

Page 42: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 42 of 47 Appendix 3 System Trouble Shooting...

Page 43: ...f a fuse or circuit breaker has been fitted to the turbine ensure that this is correctly closing the circuit Never leave the turbine running in an off load state as it may cause damage to the turbine...

Page 44: ...ure that you have the correct voltage turbine for your application Issue A slight oscillation can be observed in the turbine tail fin whilst the turbine is rotating at certain speeds Potential Causes...

Page 45: ...ce in the alternator coils dramatically increases which causes the alternator efficiency to drop drastically This effects the overall output of the turbine Performance will drop after the turbine has...

Page 46: ...s and buildings Excessive turbulence will hamper the performance of your turbine Small wind turbines operate best in steady airflows Free flowing airstreams are more consistent in direction and wind s...

Page 47: ......

Reviews:

Related manuals for GA-LETU-016