Cleaning
water and then washed with a mild detergent
solution using a bristle brush or sponge. Care should
be taken not to apply undue pressure that may
damage labels. Flush clean with water after washing.
Tools
Chalk, Hammer drill, 12mm masonry
drill bit, Mallet, 17mm spanner
Key:
Installation guidelines
tter bins
Envirobank
140
100mm
Position the body in the required location and
orientation, mark through the holes in the base
to the ground below
to pavement check that the hole
positions are not too close to the edge of the
paving slab (min 100mm from edge if possible)
Remove the body to expose the ground below,
clearly mark the positions of the four holes
with a cross
Gr
to asphalt is not recommended
1
2
3
Marking out holes
Gr
additional components:
Available as optional
extra
Gr
ts
Washer
X4
X4
100mm
PPE
Always wear appropriate PPE
equipment and follow safety guidelines.
Quality Standards
All Leafield Environmental
products are cer
tificated to BS EN ISO