5
6
Locate sack around the rear of the body.
Slide the edges of the sack into the gap in the
moulding.
Pull the sack taught and locate around the up
stand at the front of the body
Sack is taught and secured in bin body
Inserting Sack
Replacing lid
7
8
9
Locate the rear peg of the lid under the lip at
the back of the body.
Allow the lid to drop into position ensuring the
front peg locates in the body.
Push the lock firmly fixing the lid in place.
4
envinfo@leafielden
v.
com
www.leafield-environmental.com
Fitting signage
Components shown are per bin
• 1 x sign assembly
• 2 x Sign support rods
Looking down from the top
of the
bin there are two blind holes at the
back insert into each hole one sign
carrying rod push firmly into place
Once the two sign carrying rods are in place line
the two holes in the bottom of the sign assembly
with the sign rods and push the assembly down
until it stops the
sign is now ready for use
7
1
2
3
4
5