33
3.0 Power Supply
,
continued
745-573-B0-001 REV. A
CPR
TM
UPS
STARTUP
AND
INVERTER
TEST
PROCEDURE
:
1.
Verify that all connections to the CPR
TM
have been made correctly as described in Section 3.1.
2.
Verify that the desired output voltage has been selected (48V, 60V, 75V, or 87V) via the
connection at the left side of the CPR
TM
module. Check to see that the AC input cord and Battery
power cables are plugged in.
3.
Turn on the external disconnect breaker (supplied by the installer), then close the battery
breaker on the front of the CPR
TM
module. There should be only green LEDs lit on the display. If
red LEDs are illuminated, see Section 4, Troubleshooting.
4.
Verify that the “Output Voltage” green LED is lit on the front display. The CPR
TM
System should
now be providing power to your network. Verify with a voltmeter at the point where the coax exits
the cabinet.
5.
The front panel display includes “bar graph” indicators to describe input voltage levels, battery
voltage levels, and output load levels.
6.
Check the front panel test points with a true RMS voltmeter.
CABLE AC OUT
should read within
±3-5% (maximum range is tap-dependant) of the configured output voltage (48, 60, 75, 87V).
BATTERY
should read between 45 and 56Vdc (34V and 42V for 36V units), depending upon the
age, temperature, and state-of-charge of the batteries.
UPS
COMMUNICATING
SOLID
=
HANDSHAKE
FLASHING
=
DATA
OUTPUT
VOLTAGE
LED
(
GREEN
)
WEAK
BATTERY
RED
SOLID
INVERTER
ON
(
RED
FLASHING
)
Fig. 3-12, Front Panel Display
3.3
Operation