background image

Issue 1 070319

Information for the Product user:

1. Please note the requirement to dispose of Waste Electrical & Electronic Equipment separately from household waste (WEEE marked with crossed 

    out wheelie bin symbol). 

2. Please consider your role in contributing to re-use and recycling by returning this product at end of life to a collection centre for waste electrical 

    equipment or a Civic Amenity site, or to a retail outlet from which you are purchasing a replacement.

3. This equipment may contain substances that are hazardous to health and the environment if disposed of carelessly. It is important that it is separated 

    from normal household waste and recycled in the WEEE chain

4. The “crossed out wheelie bin symbol” on a product indicates this equipment must not be disposed of in normal household waste, but should be 

    disposed of according to local WEEE regulations

The Installation must be carried out by a qualified electrician

RMR5LST-01

INSTRUCTION MANUAL

PLEASE READ INSTRUCTION BEFORE COMMENCING INSTALLATION AND RETAIN FOR FUTURE REFERENCES.

! Electrical products can cause death or injury, or damage to property. If in any doubt about the installation or use of this product, consult a competent electrician

                                                                                                                      Note:

Product technical information and specification may change over time without prior notification. For the latest technical information please visit our web site 

www.robus.com or robusdirect.com

EN

Page 1

Installation

Self-Test

0°C < Ta < +40°C, 220V – 240V ~ 50/60Hz, Class II, IP65, battery warranty 3 years

Luminaire is non-dimmable 

Suitable for mounting on a normally flammable surface.

1. Ensure mains supply is switched off before commencing installation.

2. Open front cover by removing screws.

3. Use appropriate cable knockout.

4. Mark appropriated fixing points on the wall, ensure that the holes do not impinge on joists, pipe work,

    cables or other building services.

5. Insert wall plug. Insert screws, do not screw in fully.

6. Feed power cables through knock out. If required use IP Gland. 

7. Place luminaire on to screws.

8. Connect to supply terminals: Brown to L and Blue to N (for continuity connect Earth Green/Yellow to E)

9. Write installation date on the battery and connect battery to PCB.

10. Refit the front cover. 

This is a non-maintained emergency fitting, when main power is connected, the green charging LED should come on and indicating the correct battery has 

Started, The LEDs inside twin spots will still be off. When main power is lost, the fitting will go into emergency mode, LEDs inside twin spots will be on. 

Press test button once, LEDs will come on for a short period of time in the emergency mode. Testing and inspection must be in accordance with local 

codes of practice.

1. Green LED indicator comes on: Normal charging mode

2. 1-Month Self-Test: Test duration 10s

    Manual 1-Month Test: Hold and press test button for 3s and then release, there will be 2 beeps

3. 6-month Self-Test: Test duration 3 hours

    Manual 6-month Test: Press and hold test button for 6s and then release, you will hear 3 beeps

LED Indicators

4. Red LED flashes (unit will beep every 45s): Battery fault or battery failure AND emergency LED failure

5. Yellow LED flashes, (unit will beep every 45s): Emergency LED failure

6. Clear memory and re-set test schedule: Disconnect supply to Live terminal, fitting will go into emergency mode. Press in and hold the test button for 

    more than10s and then release, the emergency LED will then go out. New schedule will start when supply to fitting is connected

After installation, the battery will charge for 24 hours. The self-test function will perform a 3-hour test within the next 24 hours. After the initial test, the 

fitting will enter 1-Month Test and 6-Month Test schedules.

1. Daily check that charge indicator LED is working.

2. Monthly check: The status of LED indicator and emergency battery discharge.

3. 6-Month and one-year check: The self-test operation is working, that the LED indicators the Emergency LEDs come on and last for a minimum 3 hours

4. Complete record sheet on installation and retain in maintenance file.

5. Update file with ongoing test records for inspection by fire officer or other duly authorised person.

 

  

Start: 24-Hour

Charge

1-Month Test

10s discharge 

30th day 

Emergency battery

During test, all LED 

indicators are off. 

After the test 

 green LED back on

10s discharge 

30th day 

Emergency battery

During test, all LED 

indicators are off. 

After the test 

 green LED back on

10s discharge 

30th day 

Emergency battery

During test, all LED 

indicators are off. 

After the test 

 green LED back on

10s discharge 

30th day 

Emergency battery

During test, all LED 

indicators are off. 

After the test 

 green LED back on

10s discharge 

30th day 

Emergency battery

During test, all LED 

indicators are off. 

After the test 

 green LED back on

3hour discharge 

30th day 

Emergency battery

During test, all LED 

indicators are off. 

After the test 

 green LED back on

2-Month Test

3-Month Test

4-Month Test

5-Month Test

6-Month Test

( Half a Year )

3-hour discharge 

within the next 24hour

MUSTER 5W LED TWIN SPOT, IP65, SELF TEST, WHITE

Summary of Contents for ROBUS MUSTER

Page 1: ...l still be off When main power is lost the fitting will go into emergency mode LEDs inside twin spots will be on Press test button once LEDs will come on for a short period of time in the emergency mode Testing and inspection must be in accordance with local codes of practice 1 Green LED indicator comes on Normal charging mode 2 1 Month Self Test Test duration 10s Manual 1 Month Test Hold and pres...

Page 2: ...olgende 24 uur 1 maand test 10 s ontladen 30ste dag noodbatterij Tijdens de test zijn alle LED indicatoren uit Na de test gaat de groene LED terug aan 2 maand test Zelftestfunctie 10 s ontladen 30ste dag noodbatterij Tijdens de test zijn alle LED indicatoren uit Na de test gaat de groene LED terug aan 3 maand test 10 s ontladen 30ste dag noodbatterij Tijdens de test zijn alle LED indicatoren uit N...

Page 3: ...fallbatterie Während des Tests sind alle LED Anzeigen aus Nach dem Test leuchtet die grüne LED wieder auf 10 Sek Entladung 30 Tag Notfallbatterie Während des Tests sind alle LED Anzeigen aus Nach dem Test leuchtet die grüne LED wieder auf 10 Sek Entladung 30 Tag Notfallbatterie Während des Tests sind alle LED Anzeigen aus Nach dem Test leuchtet die grüne LED wieder auf 10 Sek Entladung 30 Tag Notf...

Page 4: ...ED indikatorjev in LED svetilk ki morajo svetiti minimalno 3 ure 4 Izpolnite evidenco testov ob namestitvi in jo shranite v servisno knjižico 5 Posodabljajte evidenco z novimi podatki o preizkusih zaradi pregleda s strani požarnega inšpektorja ali druge pooblaščene osebe Začetno 24 urno polnjenje baterije Test na 1 mesec 10s praznjenje na 30 dan delovanja baterije Med testom noben LED indikator ne...

Page 5: ...fo robus com Website www robus com IT AVVERTENZA I dispositivi elettrici possono causare lesioni gravi o la morte o danneggiare l apparecchio In caso di dubbi sull installazione o sull utilizzo di questo prodotto consultare un elettricista competente Assicurarsi che l alimentazione principale sia spenta prima di effettuare interventi EST HOIATUS Elektritooted võivad põhjustada surma raskeid vigast...

Reviews: