15
Pallet Load Front Installation /
Loading
Installation:
The installation of the PLF (Pallet
Load Front) is different than a standard
Merchandiser, Tall and Deep or Pallet Load.
It is recommended to place the PLF on a solid -
level surface.
It is recommended to use the supplied aluminum
back stop, and have it securely fastened to the
floor at least 4” away from any obstruction.
Having the unit set against the backstop will help
prevent movement during the loading process.
Attach the condensate pan to the back of the unit
at this time.
To move the unit, Insert an empty base pallet into
the lift channels. Lift the unit with a pallet jack by
the base pallet.
Move the box into place firmly against the
aluminum back stop. Lower the pallet jack and
remove the base pallet.
The unit has a rubber gasket that will seal the unit
from the outside.
Do not move the unit without the aid of a pallet
jack. Doing so will cause damage to the gasket.
Remove the lift channels before putting the unit
into operation. The lift channels are secured using
8, ½” drive bolts. Reinstall bolts to hold
aluminum trim pieces.
Retain the lift channels for use later.
Loading:
Place the pallets of ice directly on the base pallets.
Align the base pallet and ice with the aluminum
trim. Push the ice into the unit using a pallet jack.
Lower the pallet and remove the jack.
Close the doors and latch the right side.
To view a video of the loading process please
visit: