Correctly connect the long battery cable to battery terminals first, red wire is to positive plate
while black is to negative. If users connect the UPS first, electric shock or other danger could not
be avoided.
Before connecting load after UPS, users should supply main power to UPS and energize it.
Connect long battery cable to UPS terminals with correct poles link
(red is for “+”, black is for“-”), UPS will start the charging work automatically.
+
S
RED
- +
-
FUSE 125VAC,20A
RESET
INPUT
OUTPUT
+
48VDC 40A
-
EXT.BATTERY
Battery
L N N L
OUTPUT
BLACK
+
+
- +
-
- +
-
2.6 Installation
UPS installation work should comply with local electrical standard and only can be done by
professional technician. 1KVA~3KVA units could use wall socket as input power connection.
For all type UPS, it is advised to charge the battery over 8 hours before the first use. Once the AC
mains power energizes the UPS, it will charge the battery automatically. Without prior charging,
UPS output remains as usual but with shorter back up time than normal.
Installation steps
:
1.
Please take out two groups of support feet from package, assemble by embedding them with
each other as shown below.
2.
Place the two support feet in parallel on horizontal surface, and then put the machine into
two support feet carefully. Make sure the main power is off when you move it.