background image

www.legalett.com

Contactors marked K1 - K4

O.H.= Overheating protection device

ASSEMBLY

ELECTRICAL CONNECTIONS

Install  the  heating  unit  boxes  in  the  correct  location, 

with the height adjusted so that the lid is flush with the 

concrete surface, before pouring the concrete.  Refer 

to the instructions on the box cover.
1.  Run  conduit  from  one  of  the  cable  inlets  on  the 

box  to  the  local  disconnect  for  230V  power.  Run 

conduits  from  the  remaining  cable  inlets  to  a 

convenient location above the slab for each of the 

230V thermostats.

2.  (Optional)  For  future  conversion  to  water  insert, 

run a conduit for an external 24V transformer (not 

supplied)  and  optional  signal  wiring  to  the  boiler.  

As well, connect the sleeves for the inlet and outlet 

water  pipes  to  the  water  pipe  connections  of  the 

furnace box. Install the water pipes, and make sure 

they extend at least 100 mm (4") into the box.

3.  After  the  concrete  has  dried  sufficiently  with  the 

construction heater, prepare the box for the heating 

unit according to the steps below, which are performed 

by an authorized electrician and plumber.

1.  Check the electrical data on the unit so that other 

installation materials are compatible. The installation 

must be performed by an authorized electrician.

2.  Install  a  properly  sized  two-pole  local  disconnect 

to  enable  total  isolation.    GFI  protection  is 

recommended.

3.  Use properly sized copper wire for connection to the 

panel.

4.  Connect thermostats.

5.  Seal the conduits which run into the unit using a duct 

sealing compound for both water and electrical, after 

the water and electrical connections have been made 

for sound attenuation.

6.  Install the heating unit cover. Test run for 1 hour and 

then open for a check.  If necessary clean, check 

for dryness, and test run again.  If moisture is still 

present, re-install construction heater and run until 

the system is dry.

7.  Install the sound insulating foam-rubber mat between 

the heating unit cover and the floor hatch. 

8.  Install  the  floor  hatch.    If  desired,  use  standard 

transition trim between the hatch and the floor.

Overheating Protection

If the overheating protection has tripped, then complete 

the following steps:

1.  Turn off the power.

2.  Carefully investigate the reason for the overheating. 

Any repairs should only be performed by an authorized 

electrician.

If 1 - 3 thermostats are used,  install a jumper between 

the connection blocks 3 and 6, 9 and 12 as required.

Refer to the floor plan for thermostat locations.

Thermostats 1 - 4

1 P

 - 230V 60Hz

30A

 circuit breaker

Sound Insulation

mat, 30 mm (1")

Floor Hatch

Heating unit

cover

Electrical connections

Heating Insert

Heating unit box

Water pipe return hole 

(future consideration)

Water pipe inlet hole 

(future consideration)

W a t e r   p i p e 

connections  for 

future conversion 

to water

Electrical 

connections

4000E

Heating unit box 

4000A 50/50 (2")

Heating unit box 

4000A 100/100 (4") 

is similar

4.  Clean  the  furnace  box  carefully.  No  water  or 

dampness should be in the box or pipe system when 

installing the permanent insert.

5.  Install the heating unit insert with the terminal block 

turned  towards  the  electric  connection  conduit 

openings.

 75

°C

(165°F)

 75

°C

(165°F)

 75

°C

(165°F)

 75

°C

(165°F)

 110

°C

(230°F)

 110

°C

(230°F)

K1

K2

K3

K4

Blue

Black

Brow

n

C

M

1000 W

Fan

1000 W

1000 W

1000 W

O.H.

L1 L2

1

2

3

4

5

6

7

8

9

10 11 12

O.H.

O.H.

O.H.

O.H.

O.H.

LOAD

LOAD

LOAD

LOAD

L1

L1

L1

L1

L2

L2

L2

L2

L2

LOAD

L1

LOAD

LOAD

LOAD

L1

L1

L1

L1

L2

L2

L2

L2

LOAD

LOAD

LOAD

LOAD

Reviews: