Installation Instructions
LFE1U
13
1.
Measure 5 5/8" off the finished floor to mark lower mounting
locations and 32 5/8" off the finished floor for upper
mounting locations with one of the locations being centered
on stud. Holes must be 4" apart horizontally. (See Figure
17)
2.
Mark hole locations at each mounting location. (See Figure
17)
3.
Drill two 1/2” holes at marked hole locations on stud. (See
Figure 17)
4.
Drill two 1/2" holes on marked hole locations NOT on stud.
(See Figure 17)
Figure 17
5.
Hold metal channel on anchor (L) flat alongside plastic
straps and slide channel through hole. (See Figure 18)
Figure 18
6.
Holding plastic straps on anchor (L), pull anchor away from
wall until channel rests flush behind wall making sure
anchor channel is positioned vertically on stud. (See Figure
19)
7.
Slide plastic cap on anchor (L) towards wall until flange of
cap is flush with wall. (See Figure 19)
Figure 19
8.
Snap off plastic straps on anchor at wall by pushing side to
side, snapping off straps level with flange of plastic cap.
(See Figure 20)
Figure 20
9.
Repeat Steps 5 through 8 for the other mounting holes.
X
X
X
X
5 5/8
” ab
ove
finis
hed
floo
r
32 5
/8” a
bove
finis
hed
floo
r
4” a
part
4” a
part
1/2"
on stud
1/2"
(not on stud)
3
4
(L)
Drywall
Plastic Straps
5
(L)
Plastic Cap
Drywall
Anchor Metal Channel
SIDE VIEW
6
Steel Stud
7
Plastic Straps
Drywall
Anchor Metal Channel
Plastic Cap
SIDE VIEW
8
Steel Stud