LFE1U
Installation Instructions
6
TOOLS REQUIRED FOR INSTALLATION
PARTS
#2
3/16” (included)
1/8” (included)
7/32" (5.3mm) - wood studs
3/8" (10mm) - concrete
1/2" (12.7mm) - steel/wood studs
1/2"
P (1)
[Column assembly]
C (1)
[Floor plate]
A1 (1)
A2 (1)
M(4)
5/16-18 x 3 3/4”
W (1) - Display int hardware
H (1)
3/16”
K (10)
[Cable tie]
N (4)
3/16”
S (1)
G (1)
5/16-18 x 1/2"
(See interface parts list on page 7)
T (4)
5/16-18 x 1"
V (1)
[Power cable]
[Control pad bracket]
F (2)
#8-32 x 3/8"
U (1)
[Double-sided tape]
[Lower cover]
5/16-18 x 1/2"
Box "A"
Box "B"
B1 (2)
[Bottom back cover]
Hardware bag 1
J (4)
5/16-18
Hardware bag 2
L (4)
5/16-18 x 2 1/4"
X (4)
[Wall bracket]
D (1)
[Control pad + cable]
E (1)
[Motor cable]
Q (4)
5/16 x 2 3/4"
R (4)
[Fischer anchor]
Hardware bag 3
Hardware bag 4