LFE1U
Installation Instructions
8
Assembly And Installation
IMPORTANT ! :
The LFE1U packaging was designed to
help make the installation and setup easier. Do NOT
remove assembly prior to reading installation
instructions!
Cart Assembly
1.
Remove all boxes and smaller parts. Leave foam packaging
and other cardboard pieces inside to provide stability while
performing Steps 2-4. (See Figure 1)
2.
Lift column assembly (P) up by lifting at the bottom of the
assembly. (See Figure 1)
3.
Carefully set column assembly (P) base on the edge of box.
(See Figure 1)
Figure 1
4.
Use four 5/16-18 x 1" flat head cap screws (T) button head
cap screws (K) and four 5/16-18" hex nuts (J) to secure floor
plate (C) to column assembly (P) and bottom back cover
(A1). (See Figure 2)
Figure 2
5.
Remove stand from box by tipping it from the top onto the
floor plate. (See Figure 3)
Figure 3
6.
Attach control pad bracket (S) to column assembly (P) using
5/16-18 x 1/2" button head cap screw (G). (See Figure 4)
Figure 4
7.
Secure control pad (D) into control pad bracket (S). (See
Figure 5)
NOTE:
Control pad may also be attached to bottom of display
using double-sided tape (U) after display has been
installed.
8.
Route control pad cable (D) through side channel. (See
Figure 5) and (See Figure 6)
Figure 5
1
1
remove parts and packaging
2
2
3
3
(P)
4
(P)
(J) x 4
4
A1
(C)
(T) x 4
front corners
slightly curved
5
(G)
7
(R)
6
8
(D)