Installation Instructions
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
5
INSTALLATION
Preinstallation
IMPORTANT ! :
Reference the LED screen installation
manual for specific instructions regarding care, handling,
cabling and installation of the LED screens.
CAUTION:
Handle the LED screens with care, being
careful to not impact or drop the LED screen.
CAUTION:
There is a magnetic surface on the front of the
LED screen. To prevent damage ensure that no metallic
object is pulled onto the LED screen.
NOTE:
When planning the installation, remember the
requirement to run power and signal to the video wall.
Preparing LED Screens
1.
Attach four mounting buttons (L) per LED screen, one to
each corner of LED screen, with four M5 x 20mm Phillips flat
head screws (K). (See Figure 1)
Figure 1
Determining Installation Site
IMPORTANT ! :
The top of the LED screen is 7" above
the center line of the mounting lags in the mounting slots.
(See Figure 2)
NOTE:
If desired, the mount installation may be started in the
middle of the video wall, attaching mounts out from the
center to the left and right ends. Installation on smaller
walls may be easier if started at the left side of the video
wall using the following instructions.
IMPORTANT ! :
1.
Determine location for the
top left
corner of the LED wall.
(See Figure 2)
2.
Make a mark 7" below the planned top left corner of the LED
wall. (See Figure 2)
3.
Using a level, mark a horizontal line across width of LED
wall from the mark made in Step 2.
NOTE:
This line will indicate the center line for the location of the
mounting lags in the mounting slots for the top mount(s)
in the video wall. The oversize mounting slots will allow
some upward adjustment as needed. (See Figure 2) and
(See Figure 3)
Figure 2
Figure 3
(OPTIONAL) Adding Vertical Connector Kit
NOTE:
If more LED screens will need to be added to the top or
bottom of the screen configuration, add TILVABPT
vertical connector kit to top or bottom of wall mount
using the following instructions. If you are NOT adding
the TILVABPT connector kit, proceed to
Installing
First Mount
section.
(L)
LED screen
1
(K)
[TIL1X2 shown as example -
2 screens shown]
Location for top left corner of LED wall
1
2
7"
3
7”
7”
[TIL1X2PT shown as example]
3
Mounting slot
center line
Summary of Contents for CHIEF PT Series
Page 16: ...Installation Instructions TIL1X2PT TIL1X3PT TIL1X4PT TILVABPT 16 ...
Page 25: ...Installation Instructions TIL1X2PT TIL1X3PT TIL1X4PT TILVABPT 25 ...
Page 26: ...TIL1X2PT TIL1X3PT TIL1X4PT TILVABPT Installation Instructions 26 ...
Page 27: ...Installation Instructions TIL1X2PT TIL1X3PT TIL1X4PT TILVABPT 27 ...