69
DAKER DK Plus
5 kVA - 6 kVA - 10 kVA
Installa
tion manual
3 101 73
3 101 74
Total harmonic distortion
of the output voltage
< 3% at full linear load
< 7% at full non-linear load
Efficiency
up to 94%
Overload capacity
101%-105% continuous
106%-120% for 600-30 seconds (linear decrease)
126%-150% for 30-0.16 seconds (linear decrease)
Number of output phases
Single phase
Batteries and battery charger characteristics
Number of batteries
20
Battery type
Lead-acid sealed without maintenance (VRLA)
Unitary capacity
12 Vdc - 5 Ah
Rated Battery Voltage
240 Vdc
Backup time with 50%
linear load
> 5 min
Battery extension
Yes
Maximum charge current
1.86 A
Recharge time (to 90%)
4 hours
Communication and management
Screen and signalling
six pushbuttons and five LEDs for
real-time control of the status and
the main parameters of the UPS
Communications ports
RS232 and USB
Connector for network interface
Software
Software for Windows and Linux
environments is available in order to:
- displaying all the functioning and
diagnostic data in case of problems;
- setup of special functions.
Download a copy free of charge from the
website http://www.ups.legrand.com
Protections
Electronic circuits against overloads
and short-circuit
Backfeed
Emergency Power Off (EPO)
Overtemperature
Summary of Contents for DAKER DK Plus 3 101 73
Page 10: ...10 3 2 2 Onduleur armoire batteries option 3 Installation Phase 1 Phase 2 ...
Page 12: ...12 3 Installation Phase 5 Phase 6 ...
Page 38: ...38 ...
Page 46: ...46 3 2 2 UPS battery cabinet optional 3 Installation Step 1 Step 2 ...
Page 48: ...48 3 Installation Step 5 Step 6 ...
Page 74: ...74 ...
Page 82: ...82 3 2 2 UPS armadio batterie opzionale Fase 1 Fase 2 3 Installazione ...
Page 84: ...84 Fase 5 Fase 6 3 Installazione ...
Page 110: ...110 ...
Page 118: ...118 118 3 2 2 USV Batterieschrank Optional 3 Installation Schritt 1 Schritt 2 ...
Page 120: ...120 3 Installation Schritt 5 Schritt 6 ...
Page 146: ...146 ...
Page 154: ...154 154 3 2 2 SAI armario de la batería opcional 3 Instalación Paso 1 Paso 2 ...
Page 156: ...156 3 Instalación Paso 5 Paso 6 ...
Page 182: ...182 ...
Page 190: ...190 190 3 2 2 ИБП батарейный модуль опциональный 3 Монтаж Шаг 1 Шаг 2 ...
Page 192: ...192 3 Монтаж Шаг 5 Шаг 6 ...
Page 218: ...218 Notes ...
Page 219: ...219 Manuel d installation ...