24
1 Introduction
®
The Keor Line RT is an uninterruptable power supply (UPS) designed for home, commercial and
industrial applications.
You are advised to read carefully this handbook and the safety instuction sheet included in the
packaging before installing your uninterruptable power supply,meticolously following the
instruction given herein.
In case of problems with the UPS, please read this manual before contacting the technical support;
Please download the latest version of the manual from the website www.ups.legrand.com
• The UPS has been designed to supply data processing equipment. The load
applied must not exceed the one indicated on the rear label of your UPS.
• Ensure that the input voltage of the UPS matches the utility supply voltage. Use a certified input
power cable with the correct plugs and sockets for the system voltage.
• The ON/OFF button of your UPS does not electrically isolate the internal parts. To isolate your
UPS unplug it from the mains power socket.
• Do not open the UPS enclosures since there may be parts inside with dangerous high voltage
even when the mains plug is disconnected; there are no parts inside that the user can repair.
• The front control panel is provided for manual operations; Do not press on the panel with sharp
or pointed objects.
• The UPS Keor Line RT has been designed to work in closed, clean rooms free of flammable
liquids/objects, corrosive substances, conductive contaminants, sparks, smoke and gas.
• Do not place the UPS near equipment that generate strong electro-magnetic fields and/or
near equipment that are sensible to electro-magnetic fields. (engines, floppy disks, speakers,
adapters, monitors, video, etc...)
• Do not pour any liquid on the UPS or inside the UPS.
• Do not place the UPS in humid environment or near liquid, such as water, chemical solution…
2 Condition of use
40
30%~90%
ON
OFF
TEST
200mm/
8 inch
200mm/
8 inch
200mm/
8 inch
Summary of Contents for KEOR LINE RT 1000 VA
Page 12: ...12 5 Installation Step 4 Step 5 ...
Page 18: ...18 7 Maintenance de l onduleur Step 1 Step 2 Step 3 ...
Page 22: ......
Page 32: ...32 5 Installation Step 4 Step 5 ...
Page 38: ...38 7 UPS Maintenance Step 1 Step 2 Step 3 ...
Page 42: ......
Page 52: ...52 5 Installazione Fase 4 Fase 5 ...
Page 58: ...58 7 Manutenzione del gruppo di continuità Fase 1 Fase 2 Fase 3 ...
Page 62: ......
Page 72: ...72 5 Installation Phase 4 Phase 5 ...
Page 78: ...78 7 Wartung der unterbrechungsfreien Stromversorgung Phase 1 Phase 2 Phase 3 ...
Page 82: ......
Page 92: ...92 5 Instalación Fase 4 Fase 5 ...
Page 98: ...98 7 Mantenimiento del SAI Fase 1 Fase 2 Fase 3 ...
Page 102: ......
Page 112: ...112 5 Installatie Stap 4 Stap 5 ...
Page 118: ...118 7 Onderhoud van de UPS Stap 1 Stap 2 Stap 3 ...
Page 122: ......
Page 132: ...132 5 Монтаж Шаг 4 Шаг 5 ...
Page 138: ...138 7 Техническое обслуживание ИБП Шаг 1 Шаг 2 Шаг 3 ...
Page 142: ...Notes ...
Page 143: ......