7 UPS Maintenance
Battery Replacement
When the UPS is started up or a self-test is executed, the Battery Replacement LED might light up
due to battery weak or battery dead.
1. When the Battery-Replacement (RED) lights up, you may re-charge the UPS for atleast 8 ~ 10
hours and verify whether the LED lights up again after the Self-test function is executed again.
2. In case the battery replacement LED(RED) still lights up it is necessary to replace the battery.
Please read the following instruction for further details.
How to replace the batteries
CAUTION
The batteries replacement must be executed in a SERVICE ACCESS AREA.
CAUTION
The battery is heavy, pull the battery out onto flat, stable surface.
CAUTION
DO NOT DISCONNECT the batteries while the UPS is in the BACKUP mode.
• Batteries service must be performed or supervised by Legrand expert personnel knowledgeable
about batteries and the required precautions.
• When replacing batteries, replace with the same type and number of batteries or battery packs.
• Do not dispose of batteries in a fire. The batteries may explode.
• Do not open or mutilate batteries. Released electrolyte is harmful to the skin and eyes. It may be
toxic.
• A battery can present a risk of electrical shock and high short circuit current.
The followingprecautions should be observed when working on batteries:
a) Remove watches, rings, or other metal objects.
b) Use tools with insulated handles.
c) Wear rubber gloves and boots.
d) Do not lay tools or metal parts on top of batteries.
e) Disconnect charging source prior to connecting or disconnecting battery terminals
Summary of Contents for KEOR LINE RT 1000 VA
Page 12: ...12 5 Installation Step 4 Step 5 ...
Page 18: ...18 7 Maintenance de l onduleur Step 1 Step 2 Step 3 ...
Page 22: ......
Page 32: ...32 5 Installation Step 4 Step 5 ...
Page 38: ...38 7 UPS Maintenance Step 1 Step 2 Step 3 ...
Page 42: ......
Page 52: ...52 5 Installazione Fase 4 Fase 5 ...
Page 58: ...58 7 Manutenzione del gruppo di continuità Fase 1 Fase 2 Fase 3 ...
Page 62: ......
Page 72: ...72 5 Installation Phase 4 Phase 5 ...
Page 78: ...78 7 Wartung der unterbrechungsfreien Stromversorgung Phase 1 Phase 2 Phase 3 ...
Page 82: ......
Page 92: ...92 5 Instalación Fase 4 Fase 5 ...
Page 98: ...98 7 Mantenimiento del SAI Fase 1 Fase 2 Fase 3 ...
Page 102: ......
Page 112: ...112 5 Installatie Stap 4 Stap 5 ...
Page 118: ...118 7 Onderhoud van de UPS Stap 1 Stap 2 Stap 3 ...
Page 122: ......
Page 132: ...132 5 Монтаж Шаг 4 Шаг 5 ...
Page 138: ...138 7 Техническое обслуживание ИБП Шаг 1 Шаг 2 Шаг 3 ...
Page 142: ...Notes ...
Page 143: ......