310484 Modular Battery Cabinet Keor Mod
Installa
tion and main
tenanc
e manual
17
4. Installation
4.1
Safety regulations
DANGER
Before carrying out any installation operation you must read and apply the following:
- Consult chapter 2 of the manual containing mandatory safety regulations and wear the Personal Protective Equipment
mentioned in paragraph 2.3.
- Check that the UPS is turned off and no voltage is present.
- The connection to the earth ground is essential for safety and proper installation and operation. Before carrying out any
other installation operation, connect the earthing wiring. Check that the earthing has been carried out in compliance
with IEC (International Electrotechnical Commission) standards or local regulations.
- Do not carry out the installation in presence of water or humidity.
- Open only the cabinet panels necessary for the electrical connections. After that, close and fix them.
- Check there is no voltage present on the modular battery cabinet.
4.2
Electrical connections
The electrical hook-up of the modular battery cabinet to the UPS is part of the installation that is not normally performed
by the UPS manufacturer. For this reason, the indications that follow are to be considered approximate and it is recom-
mended that the electrical connections are based on local installation standards.
After removing the battery cabinet from the packaging and positioning it in its definitive place, the Skilled Technician can
begin to make the electrical connections.
The electrical hook-up must be done before installing the battery drawers to the cabinet.
WARNING
The choice of cables type and their cross sections depending on the rated current and their installations must be made as indi-
cated by the local installation standards and it is a responsibility of the Skilled Technician.
Check the KEOR MOD UPS installation manual for more information.
Summary of Contents for KEOR MOD
Page 1: ...Part LE13573AA 03 22 01 GF 310484 Modular Battery Cabinet Keor Mod Installation manual ...
Page 2: ...2 EN ENGLISH 3 310484 Modular Battery Cabinet Keor Mod ...
Page 20: ...20 4 Installation 3 4 5 ...
Page 22: ...22 4 Installation 9 10 ...
Page 42: ...42 8 Mechanical characteristics ...
Page 43: ...310484 Modular Battery Cabinet Keor Mod Installation and maintenance manual 43 ...
Page 44: ...44 8 Mechanical characteristics ...
Page 45: ...310484 Modular Battery Cabinet Keor Mod Installation and maintenance manual 45 ...
Page 46: ...46 8 Mechanical characteristics 8 1 Battery drawer all the dimensions are in mm ...
Page 50: ...50 ...
Page 51: ...310484 Modular Battery Cabinet Keor Mod Installation and maintenance manual 51 ...